On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
President Rumen Radev handed over the second exploratory mandate to form a government to the second largest parliamentary group in the 50th National Assembly - "We Continue the Change" - "Democratic Bulgaria" coalition (PP-DB). At the handing..
A contract between the US Trade and Development Agency and the Electric Power System Operator for the feasibility study for the East-West Energy Corridor was signed at the Council of Ministers. The funding, amounting to USD 1.2 million, is..
Residents of the village of Kavrakirovo, near Petrich, came out in protest because of a proposal submitted to the municipal council of the municipality of Petrich, which affects nearly 100 ha of forest land . According to the protesters, it is about the..
The best Bulgarian students in mathematics have won 5 medals by participating in the most prestigious mathematics competition in the world for 2024. At..
There are no active wildfires on the territory of Bulgaria, said caretaker Prime Minister Dimitar Glavchev at the start of the government meeting...
The former Bulgarian Minister of Defense Nikolay Nenchev will be temporarily in charge of the Bulgarian Embassy in Ukraine. This decision was taken by..
+359 2 9336 661