On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
Bulgaria’s Minister of Defence Atanas Zapryanov described as fake news the reports about terrorist threats against Bosnia and Herzegovina (BiH) from Bulgarian territory. ''Bulgaria contributes to the peace and security of Bosnia and Herzegovina by..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all flights to and from Israel until October 15, the national carrier announced on its website. The measure..
There has been no change in the security environment since Bulgaria's accession to the Schengen area on March 31, caretaker Minister of Interior Atanas Ilkov said during a working meeting with the ambassadors of the EU member states, organized by..
Caretaker Minister of Foreign Affairs Ivan Kondov is leading the Bulgarian delegation at the 45th session of the Ministerial Conference of La..
Due to the official recommendation of the European Commission and the European Union Aviation Safety Agency (EASA), Bulgaria Air has canceled all..
On Friday, lows will be between 10 and 15 degrees Celsius , 13°C in Sofia. Maximum temperatures will be between 26 and 31°C, 28° in the capital. During..
+359 2 9336 661