On Saturday, 24 September, Unit 6 of the Kozloduy Nuclear Power Plant is going off stream for scheduled annual maintenance.
The reactor will be refueled for the 28th time. All necessary resources, spare parts and qualified staff have been ensured for the repair and maintenance works. All scheduled works are in accordance with the licence obligations and technological regulations. After the repair and maintenance work is completed at the end of October, reliable and safe energy deliveries will be provided for the autumn and winter period.
Kozloduy NPP’s Unit 5 is functional and generating electricity, the power station says.
There are no active wildfires on the territory of Bulgaria, said caretaker Prime Minister Dimitar Glavchev at the start of the government meeting. "Thanks to the efforts of firefighters, the military, volunteers and everyone around this table, we can..
No nuclear weapons will be stored at the Graf Ignatievo airbase near Plovdiv . This was confirmed in a written reply by interim Defence Minister Atanas Zapryanov to a question from BSP MP Ivan Petkov. The new fighter jets at the base will be equipped..
Bulgaria's president has not refused to appoint a new ambassador to Ukraine, Rumen Radev's press service said. There was a proposal from the Denkov-Gabriel cabinet for an ambassador to Ukraine in October 2023, which the president had approved,..
The best Bulgarian students in mathematics have won 5 medals by participating in the most prestigious mathematics competition in the world for 2024. At..
There are no active wildfires on the territory of Bulgaria, said caretaker Prime Minister Dimitar Glavchev at the start of the government meeting...
The former Bulgarian Minister of Defense Nikolay Nenchev will be temporarily in charge of the Bulgarian Embassy in Ukraine. This decision was taken by..
+359 2 9336 661