After Unit 6 of the Kozloduy Nuclear Power Plant was put into operation, a leak was ascertained in the coolant system of the electricity generator. Tests are being conducted to identify the cause of the problem, Minister of Energy in the caretaker government Rossen Hristov said for bTV.
“Until the leak is eliminated, the unit will remain disconnected from the national electric energy grid. There is no change in radiation levels. The problem is technical and it is in the non-nuclear part of the system. The reactor is in normal mode,” Minister Hristov said, and added that he hoped the deadline for completing the scheduled annual maintenance – 3 November - will be met.
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second half of October, the regional departments of the Ministry of Environment and Water launched a..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at the Getty Museum in Los Angeles, the presidential press service has announced. Bulgaria,..
Over the next 24 hours the clouds will increase. The wind will pick up and will usher in cold air. Minimum temperatures 5-10° C., for Sofia around 5° C. Daytime highs will reach 8-13° C., for Sofia around 11° C. Over the mountains there will..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig..
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities..
17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war..
+359 2 9336 661