Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Construction of the Bulgaria-Sеrbia gas interconnector starts

Photo: me.government.bg

The construction of the Bulgaria-Serbia gas interconnector on Bulgarian territory starts on February 1, the Bulgarian presidential administration said. 

Bulgarian and Serbian Presidents Rumen Radev and Aleksandar Vucic will participate in the opening ceremony

The pipeline will have a total length of about 170 km from Novi Iskar, Bulgaria, to Nis, Serbia, of which about 62 km will be on Bulgarian territory. Its capacity will be up to 1.8 billion m3/year with reverse flow capability. The pipeline is a project of common interest to the EU, funded by the Connecting Europe Facility, the presidential office said.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Institute for Market Economics

High added value manufacturing marks significant growth: Institute for Market Economics

Bulgaria’s industry is being transformed in the direction of high added value productions, reads an analysis by the Institute for Market Economics. This tendency is best manifested in computer science, electronics and optics which account for the..

published on 11/16/24 2:04 PM

Monthly inflation rises to 1.1%

Acceleration of inflation to 1.1% in October compared to the previous month was registered by the National Statistical Institute. On an annual basis, the index is 1.8 percent. In October, the prices of goods and services for..

published on 11/15/24 3:22 PM

Employers and trade unions discuss the mechanism for determining the minimum wage

A working group comprising representatives of employers, trade unions and government experts is discussing the proposals of the Ministry of Labor and Social Policy for introducing a new mechanism to determine the minimum wage. This is happening a day..

published on 11/14/24 9:31 AM