Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Construction of the Bulgaria-Sеrbia gas interconnector starts

Photo: me.government.bg

The construction of the Bulgaria-Serbia gas interconnector on Bulgarian territory starts on February 1, the Bulgarian presidential administration said. 

Bulgarian and Serbian Presidents Rumen Radev and Aleksandar Vucic will participate in the opening ceremony

The pipeline will have a total length of about 170 km from Novi Iskar, Bulgaria, to Nis, Serbia, of which about 62 km will be on Bulgarian territory. Its capacity will be up to 1.8 billion m3/year with reverse flow capability. The pipeline is a project of common interest to the EU, funded by the Connecting Europe Facility, the presidential office said.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

At the beginning of 2024 economy reports weak growth with a drop in imports and exports

In the first quarter of 2024, the gross domestic product (GDP) grew by 1.8% compared to the same period in 2023 . The first forecasts were for a growth of 1.7%, according to data of the National Statistical Institute. The GDP..

published on 6/7/24 11:59 AM

High number of unemployed youth and people who do not study troubles Bulgarian labor market

The perception of the level of corruption in Bulgaria remains very high, Geoff Gottlieb, Senior IMF Regional Representative for Central, Eastern and Southeastern Europe said. From an institutional point of view, the reduction in the level of..

published on 6/4/24 5:44 PM

Number of declared private Bulgarian properties abroad is growing

Bulgarians own real estate in 64 countries around the world. This is shown by data of the National Revenue Agency, provided to the "24 Chasa" daily. By April 30, 2024, 3,604 Bulgarian citizens have declared they own real estate..

published on 6/3/24 1:22 PM