Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Social tension in Bulgaria rising over non-adopted state budget for 2023

Dimitar Manolov, leader of Podkrepa Trade Union
Photo: BGNES

Bulgaria's caretaker government, which is a technical body, gives direction for the development of the politicians who remain silent about the unadopted state budget. It is no longer possible to extend last year's budget, Dimitar Manolov, the leader of the Podkrepa trade union, told BNR. 

He pointed out that there are sectors where tensions are simmering, especially in the public administration, where many salaries are left unchanged despite rising inflation.

As a critical sector, he outlined the coal mining in the Maritsa-East complex and the closure of the thermal power plants there, which was agreed with the EU by the previous regular government. 
According to Manolov, Bulgaria has no plan "B" if the European Commission does not agree to change the commitment made by Bulgaria to sharply reduce its carbon emissions by 40% by 2025.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM