Tsarevo municipality will need ten days to draw up the documents for filling out the information about the damages inflicted by the flooding, documents which will be used to apply for financing at the interdepartmental commission for reconstruction and assistance, said Tsarevo mayor Georgi Lapchev.
A third inspection is to take place today of the towns and villages hit by the disaster, and of the infrastructure destroyed, Georgi Lapchev said. In the space of two days, experts from the municipality will provide data about the state of the bridge, connecting the old with the new town, and the causes leading to its collapse. On this bridge the floodwater swept away the four people who lost their lives in the flooding.
“The greatest amount of damage is in absolutely all lowest points on the territory of the municipality, the catchment areas, where there are bridges over the gullies,” the mayor stated.
The Sofia Christmas Festival will open tonight in the park in front of the National Palace of Culture in the heart of Sofia . The third edition of the festival starts at 6.30 pm with a rich program and attractions - а Ferris wheel, a carousel and..
Yet another, already fifth attempt by MPs to elect a Parliamentary Speaker has failed. Four candidates were put to the vote - Natalia Kiselova from BSP-Unified Left, Petar Petrov from Vazrazhdane, Raya Nazaryan from GERB and Silvi Kirilov from ITN...
The traffic of trucks in the area of the Danube Bridge at the border with Romania is heavy. This situation is expected to continue over the weekend as the trucks that were waiting at the Kapitan Andreevo crossing at the Bulgarian-Turkish border for..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661