"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
In an appeal to the DPS members, the honorary chairman of the DPS, Ahmed Dogan, demanded the resignation of the chairman of the parliamentary group, Delyan Peevski, and that of five other prominent names in the Movement for Rights and..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at the site for nearly 25 years, says that the campaign is held under the title "Will Roman statues..
Thursday will be sunny and hot. There will be more clouds in the afternoon, but short rainfalls are expected in few places. The lowest temperatures will be between 17 and 25°C; in Sofia about 18°C. The highest will be between 34 and..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between..
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
During a discussion with US President Joe Biden at the 75 th anniversary NATO summit in Washington DC, Bulgaria’s caretaker Prime Minister Dimitar..
+359 2 9336 661