"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
A plasterboard ceiling of a wedding hall came crashing down on top of 150 guests in Kardzhali. Seven people have sustained non-life threatening injuries during the incident which took place on Monday night, among them one child. At the time of the..
A new flare-up of the big wildfire on the Greek side of Slavyanka mountain has crossed the border into Bulgaria, extending the perimeter of the fire over 120 hectares of Bulgarian territory. Heavy bulldozers are making wide clearings so as to..
More than 12,000 music fans are expected to attend the concert of Lenny Kravitz in Burgas. The event at the Marine Station in the coastal city is part of the American rock singer’s Blue Electric Light Tour. The four-time Grammy award winner is..
The traditional swim across the Danube River near Silistra will take place at 9:00 am on August 10. Those wishing to participate can register just..
The National Assembly Defence Committee has given the green light for acquiring the German IRIS-T SLM air defense missile system. The bill was adopted..
There is a high probability that this would be the last regular meeting of the Council of Ministers, caretaker Prime Minister Dimitar..
+359 2 9336 661