A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.
Compiled by Yoan Kolev
Translated and posted by Milena Daynova
State-owned dairy company LB Bulgaricum will start modernising its production facility in Vidin in September. The first step will be to renovate the refrigeration units and repave the alleys leading to the workshops and the car park in..
The Minister of Innovation and Growth, Rosen Karadimov, has not given up on the idea of the Bulgarian Development Bank (BDB) granting preferential loans to those working in the public sector. In an interview with BNT, he said that..
Bulgarian protein bar manufacturer Healthy Bars is planning to build a new factory in the capital's Vrabnitsa district. The Regional Inspectorate for Environment and Water has already been notified of the intention, and the company has announced that..
The European Bank for Reconstruction and Development (EBRD) has slightly lowered its growth forecasts for the regions in which it invests. Bulgaria's..
+359 2 9336 661