Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

New solar panels manufacturing plant in Stara Zagora will need workers from the region

Photo: Pixabay

A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.  

Compiled by Yoan Kolev

Translated and posted by Milena Daynova



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Fitch Ratings: Sofia could be ready to adopt the euro in early 2025

International rating agency Fitch Ratings has affirmed Bulgaria's long-term foreign and local currency credit rating at BBB with a positive outlook, the Finance Ministry said. The positive outlook reflects the country's prospects for eurozone..

published on 10/19/24 1:43 PM

After data update, Bulgaria's GDP for 2023 has increased

In 2023, Bulgaria's GDP growth was 1.9% higher in real terms compared to 2022. This is 0.1 percent more than the initially announced growth of 1.8%, the National Statistical Institute has reported.  The chairman of the institute,..

published on 10/18/24 1:30 PM

Bulgaria and North Macedonia reaffirm their commitment to continue the construction of Railway Corridor No. 8

In Brussels, Bulgaria and North Macedonia reaffirmed their commitment to continue the construction of Railway Corridor No. 8 under the TEN-T Regulation, reported the European Commission’s Directorate General for Neighborhood Policy and Enlargement..

published on 10/17/24 8:40 AM