Podcast in English
Audio Player
Text size
Bulgarian National Radio © 2025 All Rights Reserved

ContourGlobal Maritsa East 3 TPP shutdown after contract with NEC expires

No layoffs at this stage, says CEO

Photo: BTA

The thermal power plant (TPP) ContourGlobal Maritsa East 3 - one of the two so-called American power plants - has ceased operations. The reason is the expiry of the long-term contract with the National Electricity Company for the purchase of electricity at fixed prices. "The shutdown is temporary, there will be no layoffs at this stage," CEO Vassil Shtonov told Stara Zagora media Divident.eu. The cost of electricity produced by Maritsa East 3 is 125 euro per MWh - far higher than prices on the Bulgarian Energy Exchange.

After the shutdown of the country's second largest thermal power plant, the state energy operator assured that the electricity supply system was working properly. Bulgaria's coal-fired power plants AES Galabovo TTP, Maritsa East 2 TTP and Bobov Dol are still in operation, with Bobov Dol TPP on the open market.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian processors import rapeseed from Canada due to a shortage of raw materials

One of the largest cargo ships in the world docked for the first time at the Port of Varna, delivering 58,000 tons of rapeseed, BGNES reported. The shipment arrived from Canada and will be refined in Bulgaria. The delivery was made due to a..

published on 4/12/25 4:04 PM

Fitch affirms Bulgaria's rating at BBB; Outlook Positive

Fitch Ratings has affirmed Bulgaria's Long-Term Foreign-Currency Issuer Default Rating (IDR) at 'BBB' with a Positive Outlook, reported BTA. ''Bulgaria's ratings are supported by its strong external and public finance balance sheets versus..

published on 4/12/25 9:36 AM

Minister Petar Dilov: VMZ-Sopot will not be privatized

There are no plans for the privatization of the Vazovski Machine-Building Plants (VMZ) in Sopot, and the information circulating in this regard is speculative, said Bulgaria’s Minister of Economy and Industry Petar Dilov at a working meeting..

published on 4/8/25 12:04 PM