Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

There will be no problems with approval of the Westinghouse fuel, according to Nikolai Denkov

Photo: BTA

"The electricity system is currently in a very good condition, with sufficient capacity and available options for balancing," said outgoing Prime Minister Nikolay Denkov during his visit to Kozloduy NPP. He stressed that there were no problems with the licensing of Westinghouse fuel for use at Kozloduy NPP, BTA reported. 

Valentin Nikolov, the plant's executive director, confirmed that the project was proceeding as planned. "We expect the fuel to arrive at the site... During our scheduled annual maintenance, we will introduce the first batch of Westinghouse fuel to diversify our fuel elements".

The Westinghouse fuel, which has not yet been licensed by the Nuclear Regulatory Commission, is expected in April. In May, Unit 5 of the plant will be shut down and loaded for the first time with Westinghouse fuel, which will be combined with the Russian fuel currently in use.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Raya Nazryan

National Assembly Speaker to convene extraordinary parliamentary session if one fifth of the MPs request it

The Speaker of the National Assembly, Raya Nazaryan, would convene an extraordinary session if one-fifth of the MPs proposed specific topics and points of discussion. In Kyustendil, where she is a guest of the Fertility..

published on 9/28/24 3:24 PM

Statistics show Bulgarians live in good health longer than the average level in Europe

Bulgarians live in good health longer than most citizens of the European Union, according to Eurostat data. This country is more than 4 years ahead of the average levels in the EU at the backdrop of having the lowest life expectancy..

published on 9/28/24 3:05 PM
Lyudmila Petkova

Bulgaria risks losing 1 billion euros under the Recovery and Resilience Plan

This country may lose over a billion euros of European funding due to unadopted changes to the Recovery and Resilience Plan, the new chapter to it and the updated road map for climate neutrality, which were not accepted by the..

published on 9/28/24 12:53 PM