Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Kozloduy NPP Unit 5 shut down for refuelling

Photo: Kozloduy NPP

Unit 5 of the Kozloduy Nuclear Power Plant (NPP) has been temporarily shut down for its scheduled annual maintenance and refuelling, which is expected to last until mid-June this year, the plant's authorities have confirmed.

As part of Kozloduy NPP's diversification initiative, the reactor is loaded with fuel cartridges manufactured by the US company Westinghouse.

During each annual refuelling period, a quarter of the cartridges in the reactor will be replaced. This strategic approach will ensure a gradual transition to the new nuclear fuel over a total period of four years.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Working meeting on construction of the railway line along Corridor No. 8 held in Sofia

Representatives from Bulgaria and North Macedonia participated in a working meeting dedicated to the Corridor No. 8 railway, the Ministry of Transport announced. The institution specifies that the meeting planned for October 16 in..

published on 11/1/24 8:55 AM

Weather forecast: Friday will be sunny

On Friday morning visibility will be diminished in parts of the lowlands and valleys. Minimum temperatures 5-10° C., for Sofia 6° C. During the day there will be sun with scattered clouds. Maximum temperatures 17-22° C., for Sofia around 17° C...

published on 10/31/24 6:15 PM

GERB says it would make every effort to form regular government

The GERB party will make every effort to form a regular government with a full mandate. This was what the leader of the party Boyko Borissov said this morning during a meeting with the ambassadors of the EU countries in Bulgaria. He announced this..

published on 10/31/24 5:30 PM