After 6 months of analyzes and inspections, the Ministry of Environment allowed the completion of the "Struma" highway along the route through the Kresna Gorge. Earlier, the courts also rejected requests of green organisations for a new environmental assessment of the project.
The ministry's decision ends a more than 20-year-long approval process that had delayed the completion of the last 14 km of the highway. The highway leads to Thessaloniki and is part of the route of Pan-European Corridor IV, connecting Central Europe with Greece and the Mediterranean ports. The lack of highway near Kresna creates long traffic jams and leads to frequent road accidents. If construction starts in 2025, completion is expected in 2028.
Two very important procedures depend on the election of president of parliament. Talking to reporters, Vice President Iliana Iotova said that if a president of the National Assembly is elected, then a national budget can be submitted and the president..
In Zhelyo Voivoda village, a flock of sheep infected with smallpox will be euthanized after laboratory tests confirmed that the animals are indeed infected. BNR’s correspondent in Sliven reports, citing the local administration, that the animals..
As of 1 December until the end of February, driving an old car in the centre of Sofia will be subject to a EUR 25-100 fine. The fines for legal entities will be 10 times higher – from EUR 500 to EUR 1,000. The low emission zone was put in place..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
+359 2 9336 661