Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

The large fire in Rila Mountain has been extinguished

Photo: BGNES

The fire that broke out last Thursday at an altitude of 2,300 meters in the Bayramitsa area above the village of Bistritsa and lasted for 8 days has been contained. Firefighters, forestry workers, military personnel, teams of the Rila National Park and volunteers have been combating the fire, which covered over 60 acres. Heavy machinery was used to make roads and access points for specialized firefighting equipment. The fire was eventually extinguished with the help of rain that fell last night. Firefighting teams and teams of the State Forestry- Dupnitsa are currently inspecting the area below Cherni Vrah in Rila to determine if there are still any active hotspots or smoldering fires.

Another fire in Rila, in the forest above the village of Pastra—under Mount Kalin, which started on August 18, is also under control. It was initially extinguished but later rekindled, covering over 350 hectares.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM