Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

New procedure under Recovery and Resilience Plan provides access to over BGN 1 billion for businesses

Photo: pixabay

The procedure for renewable electricity storage projects under the National Recovery and Resilience Plan is now open and proposals are being accepted. There is a lot of money, the deadlines are short and the conditions applicants have to meet are not small at all.

The measure is known as RESTORE and is part of the Low Carbon Economy section of the National Recovery and Resilience Plan. Its aim is to enable a significant increase in the share of renewable energy in the country's energy mix, while also building the necessary infrastructure to store it.

The investment will support the construction and commissioning of a national infrastructure of renewable energy storage facilities with a capacity of at least 3,000 MWh.

The budget of the long-awaited measure is more than BGN 1.15 billion, which can benefit small, medium and large enterprises.

The deadline for submitting proposals for the implementation of the investment is 21 November.

The investment must be implemented by 31 March 2026 at the latest. More information on the topic and how to apply can be found HERE.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Local authorities call for urgent reform of Bulgaria's planning districts

Urgent reform of Bulgaria's planning districts is needed, local authorities insist.The current regionalization shows increasing economic imbalances in terms of EU grant assistance. The problem is particularly severe in the Southwestern region, which..

published on 12/2/24 9:27 AM

Bulgargaz proposes that the price of natural gas for December be set at 75.89 BGN/MWh

The final price at which Bulgargaz will sell natural gas in December to end suppliers and to persons with a license for the production and transmission of thermal energy is 75.89 BGN/MWh (excluding excise duty and VAT), the company announced...

published on 12/1/24 3:55 PM

The value of the small consumer basket in Bulgaria has not changed in a year

Butter and vegetable oil are the products that have increased in price the most over the year. The retail price of vegetable oil will range between 3 and 5 BGN (EUR 1.5-2.5) per liter until the new harvest.  The value of the small consumer basket,..

published on 11/29/24 5:05 PM