On October 4, 1974, the construction of the Hemus Motorway from Sofia to Varna started. Back then, the chairman of the State Council and leader of the Bulgarian Communist Party, Todor Zhivkov, turned the first sod for the country's northern transport axis. This was also the start of construction of the motorway ring in Bulgaria. The main designer of the route is engineer Dena Palankova, BTA recalls.
By 1985, the difficult section with numerous tunnels and bridges passing through the Vitinia Pass was completed. The highest viaduct in Bulgaria (120 meters) is situated in this section. The planned length of the highway route is 418 km, which makes "Hemus" the longest motorway in Bulgaria, but currently 191 km are completed and in use. A new 7 km-long section is soon to be put in use.
T he LNG terminal near the Greek town of Alexandroupolis has officially srarted commercial operations today, the Greek company Gastrade announced. The facility features state-of-the-art technology with a maximum regasification capacity of 5.5 billion..
In September, the overall Business Climate Indicator for the country decreased by 1 point compared to August. The decline reflects a less favourable assessment in the industry sector, where the indicator fell by 5.2 points. Managers in industry reported..
The procedure for renewable electricity storage projects under the National Recovery and Resilience Plan is now open and proposals are being accepted. There is a lot of money, the deadlines are short and the conditions applicants have to meet are not..
Bulgaria has today received its first delivery of natural gas from the new Alexandroupolis terminal in Greece. The facility has been in commercial..
2024 is the best year since tourism statistics have been in existence – revenues, accommodation, number of tourists and tourist registrations, number of..
+359 2 9336 661