In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the reactor with fresh nuclear fuel will be carried out.
The fifth power unit of the Kozloduy NPP operates according to the electricity production schedule, it was reported.
Bulgaria has one nuclear power plant - Kozloduy NPP, which has two operating units - No. 5 and No. 6. Nuclear energy provides about 40% of the country's gross electricity production.
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th National Assembly, to be declared unconstitutional. These amendments concern the lifting of the..
On Friday, the wind from the south will increase and will be moderate and strong, near the northern slopes of the mountains of southern Bulgaria stormy wind is expected Clouds will be patchy, significant over the western areas, but will quickly begin..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a thematic conference organized by the Center for the Study of Democracy in Sofia, Delyan Dobrev from..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
+359 2 9336 661