Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

The Bulgarian Antarctic base "St. Kliment Ohridski" reopens for the new polar research season

Photo: Bulgarian Antarctic Institute

The Bulgarian Antarctic base "St. Kliment Ohridski" officially opened its doors on the eve of its patron saint's day. The members of the Bulgarian Antarctic expedition, led by Professor Hristo Pimpirev, set foot on the snowy shores of Livingston Island at 9:30 pm on November 23. 

The journey through the Drake Passage was carried out with the help of the Chilean naval ship Aguiles, whose crew also assisted in unloading the necessary provisions for the scientific and logistical projects before the arrival of the Bulgarian research ship St. St. Cyril and Methodius. The team is gradually putting the Antarctic base into operation under the leadership of Commander Kamen Nedkov. The team will begin preparations for the forthcoming scientific projects and continue the construction of the new laboratory bloc.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM