The Ukrainian parliament has authorized the purchase of two Russian nuclear reactors from Bulgaria, Euractiv reports. The energy committee of the Ukrainian parliament greenlighted the purchase of two old Russian nuclear reactors to expand the Khmelnytskyi nuclear power plant. "The Cabinet of Ministers of Ukraine and/or Energoatom are granted permission to negotiate, finalize the text, sign, pay for, accept and store the equipment", the amendment, seen by Euractiv, reads.
The Khmelnytskyi nuclear power plant, located in southwestern Ukraine, was built in the early 1970s. Due to the Chernobyl disaster, it has always operated at half capacity. In 2023, negotiations began for the purchase of two Russian reactors, which were originally bought by Bulgaria for the unfinished Belene Nuclear Power Plant. The planned purchase has a floating price of at least EUR 600 million, reported BGNES.
Inflation for 2024 is 2.2% compared to the previous year, the National Statistical Institute reports. In December, this indicator was 0.4%. Annual average inflation for the period January 2024 - December 2024 compared to the period January 2023 -..
Without compensation for the price of electricity, companies will be uncompetitive, said Vasil Velev of the Bulgarian Industrial Capital Association (BICA) at a press conference held jointly with trade unions. Those who cannot pass on the increase in..
Bulgarian exports are expected to grow by 5.8% annually after Bulgaria joins the eurozone. Trade in goods could increase by 3.3%, and in the services sector, growth might reach 8.4%. This is predicted by an analysis by the trade credit insurance..
+359 2 9336 661