Bulgaria’s National Electric Company has paid off all its debts to the US-owned thermal power plants ContourGlobal Maritza East 3 and AES Maritza East 1, it became clear from the written answer of Bulgaria’s Minister of Energy Temenuzhka Petkova to an opposition MP, BGNES agency informs. Between April 26 and May 9 the National Electric Company has paid a total of EUR 582.4 million to the two thermal power plants, Minister Petkova points out. The Bulgarian Energy Holding covered part of that sum with the loan taken from an international banking consortium. The rest of the money is paid from revenues.
Kozloduy Nuclear Power Plant and Westinghouse Electric Company concluded a contract on the licensing of fuel for Unit 6 of the NPP, the Bulgarian Ministry of Energy has announced. The signing, which took place in Sofia, was attended by caretaker..
Kozloduy Nuclear Power Plant and Westinghouse Electric Company concluded a contract on conducting a safety analysis for the licensing of an alternative nuclear fuel type for Unit 6 of the NPP. The signing was attended by caretaker Minister of..
There is no immediate danger to the Bulgarian waters or to the Bulgarian coastline. The oil spill is drifting to the Southeast of Kerch Bay and to the North of the Kerch strait, and there exists a serious danger of pollution of the Sea of Azov, said..
An avalanche has fallen in Pirin Mountain close to Bansko ski resort and has buried people . The Mountain Rescue Service has reported that one of the..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
On Saturday, a cold front will sweep across the country. During the night there will be rain in Western and Central Bulgaria, and snow in the..
+359 2 9336 661