Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Protesters against construction of Rumyantsevo 2 hydroelectric power plant block off traffic along Sofia-Rousse main road

Photo: Plamen Hristov

Anglers and environmentalists from all over the country blocked off traffic for about an hour along the Sofia-Rousse main road. No vehicle queues or traffic jams were formed.  

They are protesting in Rumyantsevo village near Lukovit, against the draining of rivers by small hydroelectric power plants and against the construction of Rumyantsevo 2 hydroelectric power station. The protesters are carrying posters, one of which reads: “We want our rivers and our nature. No more hydroelectric power plants.”

The organizers of the protest – the associations Balkanka and Old Otters – say thatthe construction of Rumyantsevo 2 is illegal. The section of Zlatna Panega River falls within a protected area under Natura 2000. There are many species there which are under the protection of the law, but which will vanish from the river section drained by the hydroelectric power station. Its construction is inadmissible under the Danube River Basin Management Plan 2021.  The protestors are demanding that the National Construction Control Directorate conduct an inspection of the construction documents as well as the immediate stop to the plant’s construction.  

Dimitar Kumanov, member of the management council of the Balkanka association says:

“We are protesting against the illegal construction permit, issued for Rumyantsevo 2 hydroelectric power station which will inflict damages on one of the most valuable sections of Zlatna Panega River and its unique biodiversity. We demand that the National Construction Control Directorate launch an inspection of the construction authorization documents for this hydroelectric power plant. There are several violations – the weir on the river is public state property and they have no established right to use the weir and to reconstruct it – its reconstruction means building, as stipulated by the law. They do not have authorization to use a surface water construction project, which is obligatory for the issue of the above-mentioned construction permit. The court itself ruled: “This is an illegal hydroelectric power plant.”



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

BSP will not participate in negotiations to form a government with the second cabinet-forming mandate

The Bulgarian Socialist Party (BSP) will not participate in talks with the Movement for Rights and Freedoms (DPS) for the second cabinet-forming mandate, the party's press centre said. The position of BSP is addressed to the chairman of the..

published on 7/10/24 5:41 PM
Boyko Borissov

GERB leader Borissov to DPS: We will not support second cabinet-forming mandate

The Chairman of the  GERB-SDS  Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed the coalition's position that they will not participate in negotiations to form a government with..

published on 7/10/24 5:22 PM
Delyan Peevski

Delyan Peevski opposes referendum on the euro

The Movement for Rights and Freedoms (DPS) is against the attempts of the anti-European and pro-Russian parties to play with the topic of "referendum for the euro". In a position published by the press center of the DPS, the chairman..

published on 7/10/24 4:31 PM