Podcast in English
Audio Player
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria remains the country with the lowest minimum wage in the EU

Bulgaria ranks third among EU countries in terms of minimum wage growth in the period 2015-2025. According to Eurostat, during this period the minimum wage in the country increased from 184 euros in 2015 to 551 euros 10 years later...

published on 3/19/25 9:14 AM

Bulgaria is ready to provide more assistance to North Macedonia

The Bulgarian government remains ready to provide additional assistance to its friends and neighbors if they need it in this difficult time. This was what Foreign Minister Georg Georgiev told his North Macedonian counterpart Timčo..

published on 3/19/25 8:28 AM

Restaurateurs protest against 20% VAT

By blocking dozens of major roads and busy intersections, today restaurateurs are to express their disagreement with the lack of dialogue with the government and the 20% VAT for the industry set in the 2025 budget. Restaurateurs from..

published on 3/19/25 7:35 AM