Podcast in English
Audio Player
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Procurement procedure for gas interconnection with Greece launches on 30 April

Photo: EPA/BGNES

Energy Minister Temenuzhka Petkova stated in parliament, that the procurement engineering, delivery and construction procedure for a Greece-Bulgaria gas interconnection starts on 30 April.

If the procedure goes ahead satisfactorily, construction shall be commissioned for the last quarter of 2018, with commercial exploitation set for 2020. The project could receive a 39 million euro grant, Minister Petkova added. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Foreign Minister hosts iftar dinner in honor of ambassadors of Arab countries in Bulgaria

At the beginning of the Iftar solemn dinner, which was held in honor of the ambassadors of Arab countries accredited in Sofia, Minister of Foreign Affairs Georg Georgiev emphasized the importance of dialogue , cooperation and shared responsibility for..

published on 3/29/25 10:18 AM

Bikers open the new motorcycle season in Sofia

The start of the 2025 Motorcycle Season in Sofia will be given today at 11:00 am on "Knyaz Alexander I" Square. From there, the bikers will pass through key boulevards and will reach the "Boyana" residence. If necessary, traffic will..

published on 3/29/25 5:05 AM

Bulgaria has the lowest labour costs among EU countries

Labor costs in the European Union in 2024 amounted to an average of 33.5 euros per hour, and in the eurozone countries alone - an average of 37.3 euros per hour. This is according to the latest data from the European statistical agency Eurostat...

published on 3/28/25 9:48 PM