Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria and Greece sign agreement on construction of gas interconnector

Photo: BGNES

Bulgaria and Greece signed an agreement for construction of the gas interconnector between the two countries. The project will be fulfilled by a joint venture. Bulgaria and Greece will have equal participation in the company. Initially the interconnector will have the capacity to transfer 3 billion cubic meters of gas per year. Later, it will reach its maximum capacity of 5.5 billion cubic meters. The interconnector is expected to start functioning until 2020.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Westinghouse begins studies for the delivery of fuel for Kozloduy NPP Unit 6

Kozloduy Nuclear Power Plant and Westinghouse Electric Company concluded a contract on the licensing of fuel for Unit 6 of the NPP, the Bulgarian Ministry of Energy has announced. The signing, which took place in Sofia, was attended by caretaker..

published on 12/20/24 2:33 PM

Westinghouse ready to complete construction of Kozloduy NPP Unit 7 within 10 years

Kozloduy Nuclear Power Plant and Westinghouse Electric Company concluded a contract on conducting a safety analysis for the licensing of an alternative nuclear fuel type for Unit 6 of the NPP. The signing was attended by caretaker Minister of..

published on 12/20/24 2:04 PM
Caretaker Minister of Environment and Water Petar Dimitrov

Oil spill near Kerch is far from Bulgaria and is drifting towards the Sea of Azov, Environment minister says

There is no immediate danger to the Bulgarian waters or to the Bulgarian coastline. The oil spill is drifting to the Southeast of Kerch Bay and to the North of the Kerch strait, and there exists a serious danger of pollution of the Sea of Azov, said..

published on 12/20/24 1:36 PM