The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
At the end of July, Turkiye sent a diplomatic cable to Bulgaria requesting additional water quantities from the Maritsa River. There is no regulated runoff on the river. The situation in Bulgaria is also extremely worrying due to climate changes and..
The weather on Friday will be sunny . Cloudy skies are expected in the northwestern half of the country. Mostly in the mountains of western and central Bulgaria, it will rain. Minimum temperatures will be between 14 and 21°C, in Sofia - 15°C...
At the beginning of the political consultations for the appointment of a caretaker prime minister and cabinet, the head of state indicated that the election campaign has practically started. According to Rumen Radev, the 50th National..
Bulgarian head of state Rumen Radev has met in the presidency with David Wright - commissioner of the US Nuclear Regulation Commission, who is on a..
Consumer confidence rose by 5.6 points in July, according to a survey by the National Institute of Statistics. According to consumers, the general..
Without discussion and debates, the parliament adopted conclusively the Law on the Introduction of the Euro in Bulgaria. 167 MP from GERB-SDS, the..
+359 2 9336 661