The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
President Rumen Radev was co-pilot in an F-16 fighter piloted by an Italian pilot. The demonstration flight from the Graf Ignatyevo airbase lasted 40 minutes. "The F-16 flight took me back to 2005, when General Clark, then a captain, and I flew..
''Our aid is being used on the front line as combat equipment and ammunition on the territory of Ukraine'', caretaker Minister of Defense Atanas Zapryanov told BNT regarding the military aid that Bulgaria provides to Ukraine. '' Everything we have..
Bulgaria’s Deputy Minister of Foreign Affairs Elena Shekerletova and the newly-appointed British Ambassador to Bulgaria, Nathaniel Copsey, praised the state of bilateral relations between Bulgaria and the United Kingdom. They committed to deepening..
Defence Minister Atanas Zapryanov has cancelled the air show at the Graf Ignatievo Air Base after an L-39 ZA military transport plane crashed, the..
The Supreme Administrative Court rejected the appeal of the coalition around Ahmed Dogan - "Democracy, Rights and Freedoms - DPS"..
At a Bulgarian-Chinese business forum in Sofia, President Rumen Radev pointed out the advantages of the business environment in..
+359 2 9336 661