Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

First 500 meters of the longest tunnel in Bulgaria have been excavated

Photo: BGNES

The first 500 meters of the longest tunnel in Bulgaria have been excavated. It became clear during the inspection of Minister of Regional Development and Public Works Petya Avramova at Zheleznitsa Tunnel on Struma motorway. The future road infrastructure facility will consist of two separate two kilometer-long tubes for movement in each direction. The project is financed with EU money. Struma Motorway will connect Bulgaria’s capital Sofia and the Bulgaria-Greece border.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian Vice President opens exhibition dedicated to ancient Thrace in Getty Museum

God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..

published on 11/4/24 8:47 AM

Kozloduy NPP signs engineering contract for new nuclear facilities with Hyundai and Westinghouse

An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..

published on 11/4/24 8:30 AM

The new week starts with some clouds

Monday will be mostly sunny with scattered high clouds. The lowest temperatures will be between 0° and 5°C; in Sofia - about 1°C, and the highest will reach between 13° to 18°C; in Sofia - about 14°C. In the mountains it will..

published on 11/3/24 6:15 PM