Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

WHO: Simultaneous removal of many anti-epidemic measures is a mistake

Dr. Mihail Okoliyski
Photo: BGNES-archive

The simultaneous removal of many anti-epidemic measures in Bulgaria was a move that is not in line with the world practice. As a result, we do not know the loosening of which measure led to a second peak of the Covid-19 cases in this country, the representative of the World Health Organization in Bulgaria Dr. Mihail Okoliyski told the Bulgarian National Television.

However, the Police checkpoints are not necessarily the most effective measure, Mihail Okoliyski noted. In his view, Bulgaria needs to find a balance between loosening the measures, preserving the economy and protecting the population. Despite the recent increase of Covid-19 cases, Bulgaria is among the European countries which did best during the pandemic, which means that this country is not a dangerous destination, Dr. Mihail Okoliyski said further. 




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Minister of Innovation: There was video surveillance in more than 99.5% of the polling stations

Over 99.5% of Bulgaria's polling stations were covered by video surveillance in the October 27 parliamentary elections. This was stated at a briefing by the Caretaker Minister of Innovation and Growth Rosen Karadimov, appointed by the caretaker..

published on 11/4/24 6:05 PM

17 drifting mines have been destroyed in the Black Sea since the beginning of the war in Ukraine

17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war in Ukraine until today. This was said by Fleet Admiral Velko Velkov at the opening of the Poseidon..

published on 11/4/24 5:45 PM

Bulgaria signs engineering contract for new nuclear capacity with Westinghouse and Hyundai 

An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..

published on 11/4/24 3:14 PM