Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Eighth anti-government protest lasts 7 hours with no incidents

Photo: BTA

Last night’s biggest protest so far, the 8th in a row, calling for the resignation of Prime Minister Boyko Borissov and Prosecutor General Ivan Geshev, lasted almost seven hours.

There were no clashes with law enforcement. Late in the evening, however, protesters formed a live chain in front of the police cordon to prevent any possible clashes as individuals from football gangs turned up in the square. Hundreds of police and gendarmerie with helmets and shields guarded the Council of Ministers building.

Protests also took place in Plovdiv, Bourgas, Blagoevgrad, Yambol and many other towns across the country.

Two protests have been announced for tonight – one in front of the Council of Ministers building, entitled “Protecting democracy”, and the other – in front of the Sofia Court House entitled “Freedom has no need of a flat cap”, referring to the flat cap worn by the prosecutor general. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM