An association with lead partner Glavbolgarstroy will have the right to build the section of Struma motorway across Kresna Gorge, the Road Infrastructure Agency has announced.
The cost will be 475 million Leva, VAT excluded. With indirect tax the sum will run to almost 55 million Leva (a little over 28 million euro) per kilometer. This makes the section from Krupnik to Kresna, which is 10.4 kilometers long, the most expensive road section ever built in Bulgaria, BNR’s Marta Mladenova reports. The deadline for the implementation of the project is 4 years 2 months.
The company Glavbolgarstroy was set up more than 50 years ago, and is the first to have developed basic standards in Bulgaria’s contemporary construction industry.
“I was left with the feeling that the future caretaker premier is being subjected to enormous, I would even say brutal political pressure not to have me as member of a future caretaker cabinet,” said current caretaker Interior Minister Kalin..
Around 2 , 120 military personnel from different land forces units have taken part in the efforts to put out wildfires in different parts of the country since 12 July this year, the Ministry of Defence has announced. Some of them are still..
The forest wildfires during the past weeks endangered people and settlements, but also valuable natural habitats which are home to an enormous variety of species, some of them globally endangered, the Bulgarian Society for the Protection of Birds..
President Rumen Radev appointed Bulgarian National Audit Office Vice-President Goritsa Grancharova-Kozhareva as the next caretaker Premier. The..
Bulgarian head of state Rumen Radev has met in the presidency with David Wright - commissioner of the US Nuclear Regulation Commission, who is on a..
The Bulgarian-Romanian border is now monitored from the air. The start was made on the Romanian side in Giurgiu in the presence of the Bulgarian partners..
+359 2 9336 661