Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Outage of Kozloduy NPP’s reactor 6 for preventive maintenance

Photo: Kozloduy NPP

An outage of Kozloduy nuclear power plant's Unit 6 for preventive maintenance is planned as of 29 September.

The preventive technical maintenance and the planned measures connected with the plant’s long-term exploitation will go on until the beginning of November. The reactor will be refueled with fresh nuclear fuel for the next, 27th fuel campaign. During the 12 months of the previous, 26th fuel campaign, reactor No. 6 produced over 8.2 billion kWh of electric energy.

The other, 5th reactor of Kozloduy NPP will continue functioning according to schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Turkey is ready to review the agreement between Bulgargaz and Botas

At a meeting between the Bulgarian and Turkish energy ministers in Istanbul,the Bulgarian side expressed desire to revise the agreement between "Bulgargaz" and "Botas" for the supply of gas. Turkey showed understanding and readiness..

published on 4/28/24 9:55 AM

Children will paint eggs in a National Ethnographic Museum workshop

An egg-painting workshops is opening today in the garden of the former Knyazheski palace, the Bulgarian Academy of Sciences’ National Ethnographic Museum has announced. The Museum is co-organizer of the event, alongside Sofia municipality...

published on 4/28/24 7:00 AM

740 runners take part in Kodzha Kaya mountain marathon

A record number of contestants from 8 countries are to take part in today’s Kodzha Kaya mountain marathon. Its 6 th edition of hosted by Bilka village in the Eastern portion of the Balkan range. By a tradition the marathon begins at dawn..

published on 4/28/24 5:30 AM