The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
A serious train crash involving a train owned by the Bulgarian company PIMK has occurred near Craiova, Romania. According to initial information, the train conductor of the private Bulgarian company, who is a Romanian citizen, died in the accident...
Sofia Airport has been officially renamed to Vasil Levski Airport at a solemn ceremony on February 19 . The ceremony was attended by Deputy Prime Minister and Minister of Transport Grozdan Karadjov, CEO of the airport operator “SOF Connect” Jesus..
Bulgarian diplomacy, without showing off, is using its influence to free the Bulgarian citizens who are hostages of Hamas in Gaza. We thanked the Bulgarian Ambassador Slavena Gergova and the EU Ambassador to Israel Dimitar Tsanchev, the Bulgarian..
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
+359 2 9336 661