The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
Wednesday will be sunny until noon, when clouds will move in from the northwest, bringing short, intense showers and thunderstorms. The risk of hail remains high. Lows will be between 17 and 22°C, 17°C in Sofia. Highs will be in the 30-35°C range, 30°C..
In the town of Aksakovo, in the region of Varna, Bulgaria's first all-female bagpipe group was created. This was announced by Nikola Georgiev, head of the "Trakia" bagpipe school. The girls debuted with a video clip on the Internet with a..
For the first time, the Bulgarian Antarctic base on Livingston Island will study in detail the pulsations in the Earth's ionosphere caused by solar storms and the activity of the solar corona. This is envisaged in the first Bulgarian polar..
A total of 60 officers from the Bezmer and Kabile units are on the ground with equipment for firefighting, Bulgaria's Defence Minister Atanas Zapryanov..
A man and a child have died after they were struck by lightning in the area of Mount Zhultets near Mount Botev in the Central Balkan Mountains. The alert..
The fire on the territory of the villages of Voden, Krainovo and Strandzha in the municipality of Bolyarovo has been controlled and localised. Interior..
+359 2 9336 661