The Interconnector Greece-Bulgaria (IGB) has been hooked up to the Trans-Adriatic gas pipeline (TAP). The tie-in was completed with two golden welds, connecting a gas metering station at Komotini with TAP's existing infrastructure.
The successful connection of the infrastructure of the two energy projects is key to the completion of the next stage and to the commercial launch of the IGB which was planned for later this year. This was announced by the joint investment company which is building the interconnector.
IGB connects Bulgaria to the Trans-Adriatic gas pipeline which allows natural gas to be transported from Azerbaijan via Greece to Italy and the South-East European region.
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The weather forecast is for worsening conditions, rain and snow showers and strong winds. Snow is..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief Commissioner Maria Boteva, who added that more than 2,000 additional reports were submitted in the..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the precipitation will pick up from the Northwest. During the day on Sunday the rain will continue, and..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the..
+359 2 9336 661