Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

EC President Ursula von der Leyen pays visit to Bulgaria

Photo: library

President of the European Commission Ursula von der Layen arrives in Bulgaria today to confirm support for Bulgaria’s Recovery and Resilience Plan. "The plan totals over 6.6 billion euros as the national co-financing is over 1 billion euros," Minister of Finance Assen Vassilev said. Bulgaria is expected to reduce its carbon emissions without shutting down coal facilities in the Maritsa East Basin. Bulgaria will conduct work on geothermal energy research, construction of photovoltaic parks for heating and STEM centers in schools, social inclusion programs, purchase of medical helicopters.

Ursula von der Leyen will meet with Prime Minister Kiril Petkov, ministers and party representatives in the ruling coalition. She will also visit Sofia University "St. Kliment Ohridski", where she will get acquainted with projects of innovative companies.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM