The Hemus highway, which is to link the cities of Sofia and Varna, is expected to be completed in 2027, while the section near Veliko Tarnovo will be ready in 2025. This is what Deputy Prime Minister and Minister of Regional Development Grozdan Karadzhov said in Pleven.
The minister pointed out that there were "in-house" procedures related to the construction of the highway, which had not been done in the most precise way from a legal point of view. Checks are currently being carried out, after which payments to contractors will be made. There is enough money, the minister said.
The construction of the Hemus highway started back in 1974.
With two flights of the government Airbus in two days, the Bulgarian state managed to evacuate 169 Bulgarians and their families from Lebanon after the escalation of tensions there. "Thank God we're back, " says one of the Bulgarians with..
Trust in NATO (40.1%) and the EU (59.5%) in Bulgaria has increased by 8 and 5 percent respectively in comparison to 2023, according to a study by Gallup International Balkan on attitudes towards the two organizations. Speaking to..
At the invitation of his German counterpart Annalena Berbock, minister Ivan Kondov participated in the meeting of foreign ministers of the countries of the Berlin Process. At the forum in Berlin, Kondov pointed out the importance of..
Some of the Bulgarians in Lebanon were evacuated on a government aircraft flight on Monday evening. The first group, consisting of 89 people, mostly..
''The second evacuation flight from Lebanon will be carried out today around noon, provided the circumstances are favorable'', caretaker Premier Dimitar..
Bulgaria’s caretaker Minister of Foreign Affairs Ivan Kondov met in the United States with John Bass, Acting Under Secretary of State for Political..
+359 2 9336 661