The EU Energy Council has agreed that gas storage sites in the Community must be filled to at least 80% of their capacity by Nov. 1, 2022, and to 90% by Nov. 1 in subsequent years.
In the case of Bulgaria, which only has the Chiren gas storage facility, this means that it must be filled to 4.64 terawatt hours (TWh) for the coming winter and to 5.22 TWh for the winter of 2023.
During the meeting of the Council in Luxembourg, an agreement was signed between Bulgartransgaz EAD and the EU, under which the European Commission finances the expansion of the Chiren depot within the framework of the Connecting Europe Facility (CEF) with EUR 78 million, i.e. 80% of the price. The expansion will increase the storage volume at Chiren to one billion cubic metersand the daily production and injection capacities to 8-10 mcm.
In May, the economic situation in the country improved for a second month in a row. There was an improvement in retail trade, construction and services, but there was a decline marked in industry. In construction, industry and services, no price..
The Bulgarian National Bank held an auction for the sale of securities with 3-year maturity at a 3% interest rate. At the auction, the Ministry of Finance offered bonds worth EUR 150 million. Interest will be paid once in 6 months, with the loan..
The Bulgarian National Bank published a review of measures aimed to address the risks to the banking system, including those stemming from loans secured by residential real estate. ''Such concerns are well-founded given the situation in the real..
+359 2 9336 661