The EU Energy Council has agreed that gas storage sites in the Community must be filled to at least 80% of their capacity by Nov. 1, 2022, and to 90% by Nov. 1 in subsequent years.
In the case of Bulgaria, which only has the Chiren gas storage facility, this means that it must be filled to 4.64 terawatt hours (TWh) for the coming winter and to 5.22 TWh for the winter of 2023.
During the meeting of the Council in Luxembourg, an agreement was signed between Bulgartransgaz EAD and the EU, under which the European Commission finances the expansion of the Chiren depot within the framework of the Connecting Europe Facility (CEF) with EUR 78 million, i.e. 80% of the price. The expansion will increase the storage volume at Chiren to one billion cubic metersand the daily production and injection capacities to 8-10 mcm.
The international rating agency Standard & Poor's (S&P Global Ratings) has affirmed Bulgaria's 'BBB/A-2' long-term and short-term foreign and local currency sovereign credit ratings. The rating outlook remains positive. If a stable..
In the next 3 to 5 years, Bulgaria will experience a shortage of more than 250,000 specialists with higher education. For the past 8 years, Bulgaria has missed the opportunity, which a number of EU countries have taken advantage of, to conclude an..
The Governing Council of the Bulgarian National Bank (BNB) has ordered banks in the country to apply a minimum set of 6 indicators for monitoring credit standards when granting and renegotiating loans secured by residential real estate . The aim is to..
+359 2 9336 661