The Greece-Bulgaria gas interconnector has successfully been connected to Bulgaria’s national and transit gas transmission network.
According to the project company, connecting the infrastructure of the two independent transmission operators for Bulgaria - ICGB and Bulragtransgaz – was carried out between 16 and 17 August near Stara Zagora.
The interconnector is already successfully connected to the operators in the two neighbouring countries, and this means that the physical transmission of gas along the pipeline is technically provided for. After the mandatory non-destructive testing of the interconnector with the Bulgartransgaz network, the section will be buried. With this, all mechanical work will have been completed.
The leader of "DPS-New Beginning" Delyan Peevski has called on the caretaker government and all responsible institutions, including the parliament, to give MEP Elena Yoncheva a mandate to negotiate for the release of the captured..
God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..
An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..
Today, 3 November, is International Day for Biosphere Reserves, declared by UNESCO’s Man and the Biosphere programme. On this occasion, as of the second..
Today, Vice President Iliana Iotova is opening the exhibition “Ancient Thrace and the Classical World: Treasures from Bulgaria, Romania, and Greece” at..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they..
+359 2 9336 661