The gas interconnector between Bulgaria and Greece already has received a pre-operational license (Act 15) for the territory of Bulgaria, the project company "ICGB", which will be the operator of the gas pipeline, has announced. From there, they assured that the procedures for putting the gas interconnector into operation are progressing according to schedule and it will start commercial operation on October 1.
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between Bulgaria and Romania. Along the 409 km long border, there are just two bridges and 5 ferries, some of..
Vazrazhdane and There Is Such a People (ITN) are to submit, to the National Assembly, a draft decision for the holding of a referendum on preserving the Bulgarian Lev, said Vazrazhdane MP Tsoncho Ganev. This is an initiative which the previous..
Answering a question in parliament, caretaker Minister of Culture Maestro Nayden Todorov stated that the National Culture Fund has a staff of only 11, people who have to distribute millions of euro for culture under the Recovery and Resilience Plan...
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at..
After 17 MPs from the Movement for Rights and Freedoms, MRF, were expelled, among them the party’s other co-chair Dzevdet Chakarov, MRF MP Ahmed..
+359 2 9336 661