The gas interconnector between Bulgaria and Greece already has received a pre-operational license (Act 15) for the territory of Bulgaria, the project company "ICGB", which will be the operator of the gas pipeline, has announced. From there, they assured that the procedures for putting the gas interconnector into operation are progressing according to schedule and it will start commercial operation on October 1.
A plasterboard ceiling of a wedding hall came crashing down on top of 150 guests in Kardzhali. Seven people have sustained non-life threatening injuries during the incident which took place on Monday night, among them one child. At the time of the..
A new flare-up of the big wildfire on the Greek side of Slavyanka mountain has crossed the border into Bulgaria, extending the perimeter of the fire over 120 hectares of Bulgarian territory. Heavy bulldozers are making wide clearings so as to..
More than 12,000 music fans are expected to attend the concert of Lenny Kravitz in Burgas. The event at the Marine Station in the coastal city is part of the American rock singer’s Blue Electric Light Tour. The four-time Grammy award winner is..
The caretaker government has allowed the Bulgarian military to train Ukrainian soldiers on the territory of NATO member states. The reasoning states that..
There is a high probability that this would be the last regular meeting of the Council of Ministers, caretaker Prime Minister Dimitar..
Consumer confidence rose by 5.6 points in July, according to a survey by the National Institute of Statistics. According to consumers, the general..
+359 2 9336 661