The gas interconnector between Bulgaria and Greece already has received a pre-operational license (Act 15) for the territory of Bulgaria, the project company "ICGB", which will be the operator of the gas pipeline, has announced. From there, they assured that the procedures for putting the gas interconnector into operation are progressing according to schedule and it will start commercial operation on October 1.
Thursday will be sunny and hot. There will be more clouds in the afternoon, but short rainfalls are expected in few places. The lowest temperatures will be between 17 and 25°C; in Sofia about 18°C. The highest will be between 34 and..
The number of healthcare specialists in Bulgarian hospitals is drastically decreasing. According to data presented during the National Meeting of Nurses on July 10 in Sofia, the number of healthcare professionals in Bulgarian hospitals has decreased..
The Bulgarian Socialist Party (BSP) will not participate in talks with the Movement for Rights and Freedoms (DPS) for the second cabinet-forming mandate, the party's press centre said. The position of BSP is addressed to the chairman of the..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between..
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at..
+359 2 9336 661