Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

New photovoltaic production plant will be operational in Yambol by the end of 2023

Photo: pixabay

Italian company for the production of photovoltaic modules has invested about 7 million euros in its new factory in the Bulgarian city of Yambol. Construction is expected to begin in April 2023 and production will start by the end of next year. About 50 new jobs will be opened as the specialists needed are engineers and experts from the IT sphere. Production will be environmentally friendly, with no risk of pollution, as the goal is its capacity reaching 600 megawatts. A photovoltaic park on an area of about 600 decares will also be built next to the factory.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

OMV Petrom takes over the gas exploration in the Bulgarian Black Sea area

The Romanian company OMV Petrom, which is part of the Austrian OMV, has taken over as operator of the Han Asparuh perimeter in Bulgaria. OMV Petrom replaced Total Energies as the operator of the Han Asparuh deep water perimeter in Bulgaria, according to..

published on 3/27/24 10:30 AM

Bulgaria has the lowest purchasing power in the EU, Eurostat preliminary data shows

Bulgaria's GDP per capita, expressed in purchasing power standards (PPS), remains the lowest in the EU, according to preliminary data from Eurostat, the official European statistics agency. In 2023, the purchasing power of European citizens ranges..

published on 3/26/24 1:40 PM

Parliament approves construction of reactors 7 and 8 of NPP Kozloduy

The National Assembly voted, at second reading, to give the go-ahead to cooperation with the US for the construction of reactors 7 and 8 of the Kozloduy Nuclear Power Plant. Parliament greenlights nuclear project with US technology..

published on 3/21/24 12:03 PM