The Ministry of Defence has terminated the public procurement procedure for the delivery of 6 overhauled engines for MiG-29 fighter aircraft, the Bulgarian news agency BTA reports, citing data from the public procurement register.
The reason is that not a single bid has been made in the call for tender announced in March with an estimated value of EUR 13.49 million, VAT included, the BTA reports. At the end of June, the Bulgarian TEREM-HOLDING EAD won the other public contract for the repair of six engines for the Bulgarian MiG-29s.
However, it is going to use as subcontractor the Lutsk Repair Plant “Motor”, Ukraine, whose share of the contract is 90%.
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities and the Westinghouse and Hyundai consortium . Within a year, the engineering design, worth between..
In 63 polling stations out of a total of 11 626 polling stations that should have been equipped with CCT V, there was no live video feed and recording of the 27 October snap elections. This was announced by the deputy chairperson and spokesperson of the..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig Breeders reports. In the last week of October, 201 cases of the disease among wild boars were detected..
For the first time in recent election history, the end election result leaves a party running in the election outside the National Assembly with a..
The European Parliament has approved the nomination of Bulgarian Ekaterina Zaharieva as European Commissioner. She will be in charge of the 'Start-ups,..
A meeting of the interior ministers of Bulgaria, Romania and Austria in Budapest could lead to a change in Austria's stance on the two countries joining..
+359 2 9336 661