Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

New solar panels manufacturing plant in Stara Zagora will need workers from the region

Photo: Pixabay

A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.  

Compiled by Yoan Kolev

Translated and posted by Milena Daynova



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Petar Ganev

Institute for Market Economics: The future administration of the country must make unpopular decisions

Petar Ganev , senior researcher at the Institute for Market Economics announced, for the BNR, the publication of their white paper of the Bulgarian economy – Unlocking growth: the road ahead after the election. “Concord should be sought and..

published on 10/30/24 10:41 AM

Bulgarian business is looking to hire 261,926 new workers and professionals

In the next 12 months, the Bulgarian business needs about 262,000 workers and specialists , according to a study by the Employment Agency. This is nearly 9.3% of the currently employed. Compared to the results in 2023, there is a..

published on 10/24/24 11:42 AM

Bulgaria will apply method used in France and Spain to combat hail

There will be pilot testing of ground-based silver iodide generators for hail protection in two zones where the use of rockets is not allowed, the Deputy Minister of Agriculture Ivan Kapitanov said.  At a meeting with Claude Berthet,..

published on 10/24/24 11:21 AM