A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.
Compiled by Yoan Kolev
Translated and posted by Milena Daynova
Sofia is the best city in Europe to retire to, according to a survey by the business solutions company Moneypenny, Forbes writes. The survey takes into account factors such as average cost of living, retirement savings needed, and a variety of..
The Bulgarian National Bank has lowered the base interest rate for the second consecutive month. As of August 1, it stands at 3.53%, down from 3.63% in July. Since the end of 2023, the base interest rate has been gradually falling. From February..
Moody's expects Bulgaria to join the Eurozone no later than the beginning of 2026. According to the rating agency, the growth of the Bulgarian economy in 2024 will be 2.9%. The ongoing domestic political crisis and the likelihood of new early elections..
+359 2 9336 661