A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.
Compiled by Yoan Kolev
Translated and posted by Milena Daynova
In the space of 15 years, from 2005 until 2020, 75% of the farms in the country have disappeared – from 500,000 in 2005 down to 132,000 in 2020, said Prof. Dr. Bozhidar Ivanov, Director of the Institute of Agrarian Economics at an international..
In October 2024, the total business climate indicator decreased by 5.6 percentage points compared to September, dropping from 22.5% to 16.9%. The index declined in all monitored sectors, the National Statistical Institute announced. In industry, the..
Petar Ganev , senior researcher at the Institute for Market Economics announced, for the BNR, the publication of their white paper of the Bulgarian economy – Unlocking growth: the road ahead after the election. “Concord should be sought and..
+359 2 9336 661